Details NBI 2012
| State: | NV |
|---|---|
| Place Name: | Las Vegas |
| County: | Clark |
| NBI Structure Number: | B1473 |
| Route Sign Prefix: | U.S. Highway |
| Route Number: | 95 |
| Facility Carried: | US 95 |
| Feature Intersected: | DRY WASH |
| Location: | LAS VEGAS |
| Year Built: | 1977 |
| RecordType: | Roadway is carried ON the structure |
| Level of Service: | Mainline roadway |
| Owner: | State Highway Agency |
| Highway Agency District: | 01 |
| Maintenance Responsibility: | State Highway Agency |
| Functional Class: | Principal Arterial - Other Freeways, Urban |
| Service On Bridge: | Highway |
| Service Under Bridge: | Waterway |
| Latitude: | 36 11 33.47 N |
| Longitude: | 115 14 43.04 W |
| Material Design: | Concrete |
| Design Construction: | Culvert (includes frame culverts) |
| Approach Material Design: | Other |
| Approach Design Construction: | Other |
| Structure Length (m): | 6.7 |
| Approach Roadway Width (m): | 23.8 |
| Lanes on Structure: | 7 |
| Average Daily Traffic: | 137000 |
| Year of Average Daily Traffic: | 2009 |
| Design Load: | MS 18+Mod |
| Scour: | Bridge foundations determined to be stable for the assessed or calculated scour condition. |
| Bridge Railings: | Meet currently acceptable standards. |
| Historical Significance: | Bridge is not eligible for the National Register of Historic Places. |
| # of Spans in Main Structure: | 2 |
| StructureFlared: | No flare |
| Transitions: | Meets currently acceptable standards. |
| Approach Guardrail: | Meets currently acceptable standards. |
| Approach Guardrail Ends: | Meets currently acceptable standards. |
| Navigation Control: | No Navigation Control on waterway (bridge permit not required). |
| Structure Open?: | Open, no restrictions |
| Deck: | Not Applicable |
| Superstructure: | Not Applicable |
| Substructure: | Not Applicable |
| Structural Evaluation: | Somewhat better than minimum adequacy to tolerate being left in place as is |
| Sufficiency Rating (%): | 59.0 |