• Increase font size
  • Default font size
  • Decrease font size

Details NBI 2015

Place Name:District 2 (Supervisor District)
NBI Structure Number:SA0200000000087
Route Sign Prefix:County Highway
Route Number:95
Facility Carried:'CR 201
Feature Intersected:'PHILLIPS CREEK
Location:'SEC 7 T 2S R 8E
Year Built:1978
Status:Structurally Deficient
RecordType:Roadway is carried ON the structure
Level of Service:Mainline roadway
Owner:County Highway Agency
Highway Agency District:01
Maintenance Responsibility:County Highway Agency
Functional Class:Local, Rural
Service On Bridge:Highway
Service Under Bridge:Waterway
Latitude:34 55 24.60 N
Longitude:88 29 29.80 W
Material Design:Wood or Timber
Design Construction:Stringer/Multi-beam or Girder
Approach Material Design:Other
Approach Design Construction:Other
Structure Length (m):1.3
Approach Roadway Width (m):0.5
Lanes on Structure:2
Average Daily Traffic:50
Year of Average Daily Traffic:2013
Design Load:M 9
Scour:Bridge foundations determined to be stable for assessed or calculated scour condition.
Bridge Railings:Do not meet currently acceptable standards.
Historical Significance:Bridge is not eligible for the National Register of Historic Places.
# of Spans in Main Structure:3
Bridge Median:No Median
StructureFlared:No flare
Transitions:Not Applicable
Approach Guardrail:Not Applicable
Approach Guardrail Ends:Not Applicable
Navigation Control:No Navigation Control on waterway (bridge permit not required).
Structure Open?:Posted for Load.
Deck:Fair Condition
Superstructure:Critical Condition
Substructure:Critical Condition
Structural Evaluation:Basically intolerable requiring high priority of replacement
Sufficiency Rating (%):2.85