• Increase font size
  • Default font size
  • Decrease font size

Details NBI 2015

Place Name:District 4 (Supervisor District)
NBI Structure Number:21000840190513A
Route Sign Prefix:U.S. Highway
Route Number:84
Facility Carried:'US 84
Feature Intersected:'MCCALL CREEK TRIB NO 3
Location:'1.5 MI W LINCOLN CL
Year Built:1997
RecordType:Roadway is carried ON the structure
Level of Service:Mainline roadway
Owner:State Highway Agency
Highway Agency District:07
Maintenance Responsibility:State Highway Agency
Functional Class:Principal Arterial - Other, Rural
Service On Bridge:Highway
Service Under Bridge:Waterway
Latitude:31 31 05.89 N
Longitude:90 39 28.26 W
Material Design:Prestressed concrete *
Design Construction:Stringer/Multi-beam or Girder
Approach Material Design:Prestressed concrete *
Approach Design Construction:Stringer/Multi-beam or Girder
Structure Length (m):6.1
Approach Roadway Width (m):0.7
Lanes on Structure:2
Average Daily Traffic:2300
Year of Average Daily Traffic:2012
Design Load:MS 18
Scour:Bridge foundations determined to be stable for the assessed or calculated scour condition.
Bridge Railings:Meet currently acceptable standards.
Historical Significance:Bridge is not eligible for the National Register of Historic Places.
# of Spans in Main Structure:1
# of Spans in Approach Structures:3
Bridge Median:No Median
StructureFlared:No flare
Transitions:Does not meet currently acceptable standards.
Approach Guardrail:Does not meet currently acceptable standards.
Approach Guardrail Ends:Meets currently acceptable standards.
Navigation Control:No Navigation Control on waterway (bridge permit not required).
Structure Open?:Open, no restrictions
Deck:Very Good Condition
Superstructure:Very Good Condition
Substructure:Very Good Condition
Structural Evaluation:Equal to present desirable criteria
Sufficiency Rating (%):9.89