Details NBI 2012
| State: | MA |
|---|---|
| Place Name: | Worthington (Town of) |
| County: | Hampshire |
| NBI Structure Number: | W4501109DMUNNBI |
| Route Sign Prefix: | Local Road |
| Facility Carried: | HWY RIVER RD |
| Feature Intersected: | WATER M BR WESTFIELD RIV |
| Location: | 2 MI E OF PERU T.L. |
| Year Built: | 1938 |
| RecordType: | Roadway is carried ON the structure |
| Level of Service: | Mainline roadway |
| Owner: | Town or Township Highway Agency |
| Highway Agency District: | 01 |
| Maintenance Responsibility: | Town or Township Highway Agency |
| Functional Class: | Local, Rural |
| Service On Bridge: | Highway |
| Service Under Bridge: | Waterway |
| Latitude: | 42 25 07.00 N |
| Longitude: | 72 59 04.00 W |
| Material Design: | Steel |
| Design Construction: | Stringer/Multi-beam or Girder |
| Approach Material Design: | Other |
| Approach Design Construction: | Other |
| Structure Length (m): | 9.7 |
| Approach Roadway Width (m): | 6.4 |
| Lanes on Structure: | 2 |
| Average Daily Traffic: | 300 |
| Year of Average Daily Traffic: | 2008 |
| Design Load: | M 13.5 |
| Scour: | Bridge foundations determined to be stable for the assessed or calculated scour condition. |
| Bridge Railings: | Do not meet currently acceptable standards. |
| Historical Significance: | Historical significance is not determinable at this time. |
| # of Spans in Main Structure: | 1 |
| Bridge Median: | No Median |
| StructureFlared: | No flare |
| Transitions: | Does not meet currently acceptable standards. |
| Approach Guardrail: | Does not meet currently acceptable standards. |
| Approach Guardrail Ends: | Does not meet currently acceptable standards. |
| Navigation Control: | No Navigation Control on waterway (bridge permit not required). |
| Structure Open?: | Posted for Load. |
| Deck: | Satisfactory Condition |
| Superstructure: | Good Condition |
| Substructure: | Good Condition |
| Structural Evaluation: | Equal to present minimum criteria |
| Sufficiency Rating (%): | 80.6 |